Solar panels in Cerdà
We install solar panels in Cerdà with a genuine study first: the sunlight your roof actually gets and your hour-by-hour electricity use. We do the installation and the paperwork with the council and the regional industry department. We are engineers based in Xàtiva and, once the system is in, we stay: we check your production every day.
The council procedure in Cerdà
In Cerdà it goes through a responsible declaration: the documentation is filed with the council and there is no need to wait for a licence decision. We file it for you, along with the rest of the paperwork until the installation is fully legalised.
Cerdà town hall publishes a table of taxes and discounts on its website that lists a discount for fitting solar panels, but that table cites no article and no bulletin behind it, and the relevant tax ordinance is not published anywhere accessible, not on the online office, not on the transparency portal, and not in the BOP. That is why this page publishes no percentage: once the ordinance text is available, the figure will appear here with its link and date. The catalogue on the online office, which runs on the Diputació platform, has only six generic procedures and none for building work, so the file goes in through the electronic register or a general application, under the Valencian framework's declaración responsable regime.
What we charge for filing that procedure is published: the price of the council procedure in Cerdà.
Frequently asked questions in Cerdà
Does Cerdà discount the IBI or the ICIO for fitting solar panels?
The town hall publishes a table of taxes and discounts on its website that lists a discount for fitting panels, but that table cites no article and no bulletin, and the tax ordinance does not appear published on the online office or the transparency portal. That is why we do not state a percentage here.
So, am I entitled to a discount or not?
Very probably yes, which is exactly why it is worth asking. When we prepare your study, we check directly with the town hall, and if the ordinance backs it up, we file the application with the rest of the paperwork. Once the text is published, the figure will appear on this page with its link.
What procedure do you file in Cerdà?
The catalogue on Cerdà's online office, on the Diputació platform, publishes only six generic procedures and none for building work, so the file goes in through the electronic register or a general application. Above that, the Valencian framework's declaración responsable applies for rooftop self-consumption.
What we do in Cerdà
The study of your roof and your hour-by-hour usage, the installation, and the paperwork with the council, the grid operator and the regional industry department (Industria). How we size a system and which warranties go in writing is in solar panels with a proper study; what we file with each body, in permits and legalisation.
Local IBI and ICIO reductions depend on the by-law in force each year; if one applies, we claim it with the file. Income tax deductions run separately: grants and deductions 2026.
The rest of what we do in Cerdà
We climb onto a roof in Cerdà for the panels and, while we are there, we handle what hangs off them:
- Energy performance certificate in Cerdà
- Electric car charger in Cerdà
- Solar panel maintenance and repair in Cerdà
- Production monitoring in Cerdà
- Permits and legalisation in Cerdà
- What an installation costs and what drives the price
- Shading and orientation of your roof
- Brands and warranties we put in writing
- Savings calculator from your own bill
Where else we work in La Costera
Each village next to Cerdà has its own page, with its own ordinance and its own paperwork. These are the ones in La Costera:
Start with the study
Tell us where your house in Cerdà is and what you pay for electricity. We will tell you what we need to study your roof and your usage. No commitment and no salesman knocking on your door.
A Captia Technology company. Qualified, chartered engineers.