In Moixent it goes through a responsible declaration: the documentation is filed with the council and there is no need to wait for a licence decision. We file it for you, along with the rest of the paperwork until the installation is fully legalised.
Moixent has its own municipal ordinance for grid-connected solar self-consumption installations, published within the town hall's book of ordinances. Its article 4 separates installations of 10 kW or under, which go with a technical design report and drawings, a basic safety study and a waste management study, from larger ones, which need a signed-off project and a certificate from the site manager. The technical report must be signed by a low-voltage installer in section D, qualification 0, category 9 (generating installations), and proof of that accreditation must be attached. Also required: a detailed quote, whose value before VAT sets the ICIO tax base, a structural safety certificate for the roof, neighbours' consent when the installation sits in a shared area and, if it belongs to a local energy community, the paperwork setting it up along with its list of members. Articles 3.3 and 6.2 take properties in the Catálogo municipal de Bienes y Espacios Protegidos (the local register of protected buildings) and those within a BIC area out of the declaración responsable regime: these need a building licence, a landscape integration study and authorisation from the Conselleria de Cultura (art. 35 of the Llei 4/1998 del Patrimoni Cultural Valencià).
What we charge for filing that procedure is published: the price of the council procedure in Moixent and of both tax reduction applications.