Menu

A home battery sized around your own consumption

A battery stores the energy your panels produce during the day and gives it back at night. The unit carries no catalogue price: it depends on usable kWh, on DC or AC coupling and on the electrical work. The upfront paperwork check does: €49, VAT included, and credited back if you go ahead.

If you are still weighing a real battery against a virtual one or plain surplus compensation, that comparison lives in battery or surplus. This page is the other half: what we install, what we do not, how it is done and what paperwork it drags along.

  • Chartered, qualified engineers
  • Make, model and usable capacity in the quote
  • Milestone payments, never everything upfront

What does carry a published price today

The documentary check on your existing panels. It is the first step whenever a battery is added to a system that is already in place.

Upfront assessment

€49

VAT included

€49 credited back if you book a €199-or-more service within 30 days

Resolution work, from €199

Last legal review: .

What a battery actually solves in your home

It solves a timing mismatch: panels produce at midday and most houses use their power early in the morning and at night. Without a battery that surplus goes to the grid and is offset on the bill at whatever your tariff pays. With a battery it is stored and used when buying that same energy would cost more.

It is not compulsory and it does not always pay off. What decides is your consumption curve, not a catalogue. What suppliers pay today for each exported kWh is in surplus tariffs compared, and the order of magnitude of a full installation is in how much solar panels cost.

What the battery we install includes, and what it does not

What is included

  • Battery sizing based on your hour-by-hour consumption curve and the estimated output of your roof, not on a package table.
  • Supply of the unit with make, model, usable capacity in kWh and written warranties inside the quote.
  • Installation by a licensed installation company, with the installation certificate that whoever carries out the work must issue.
  • Integration with the inverter: DC coupling with a hybrid inverter, or AC coupling onto the unit you already have, depending on what the study shows.
  • Configuration of charge and discharge modes, and a walk-through of the app you will be checking it on.
  • Commissioning, with a check that the battery charges and discharges when it should, and handover of the equipment documentation.

What is not included

  • Backup power during a grid outage if the installation has not been sized and wired for it: that is decided before buying the unit, not afterwards.
  • Updating the official file when the battery is added to an installation fitted by another company: that is a separate service.
  • Regularising an installation that was never legalised.
  • The installation certificate for work carried out by another company: it is issued by whoever performs the installation.
  • Building work or switchboard upgrades when the location or the house wiring require them: quoted separately, with the figure in plain sight.
  • Any promise about an authority's decision. We file and follow up; deciding is not ours.

What falls outside is covered by: legalising an added battery, checking the state of your paperwork.

How it works, step by step

Six steps, each with someone responsible for it. Installation dates sit in your quote, on equipment already ordered: we do not publish a generic works deadline because it would depend on the unit chosen and on your house.

  1. Step 1 · You

    You send us your latest bill, the hourly consumption recorded by your meter and, if you already have panels, the installation paperwork.

  2. Step 2 · Captia

    We cross your consumption curve with your roof's output according to PVGIS and work out how many kWh you would really store. If a battery does not pay off for you, we say so in writing.

  3. Step 3 · Captia

    You get the quote with make, model, usable capacity, warranties, a milestone payment schedule and an installation date. That date sits in your quote, with the equipment already ordered.

  4. Step 4 · Licensed installation company

    Fits the battery, connects it and issues the installation certificate for the work carried out.

  5. Step 5 · Captia

    Commissioning, configuration of charge and discharge modes and handover of the folder with the equipment documentation.

  6. Step 6 · Captia and the authorities

    If the battery is added to an installation that already existed, the official file has to reflect it. That is a separate service and its decision time belongs to the authorities, not to us.

What we need from you

Six things, none of which require you to know about electrics. The first three are enough to start sizing.

Your latest electricity bill, with the CUPS supply code visible
It is the only thing that identifies your supply point without ambiguity, and it shows which tariff you are on.
The hourly consumption from your meter
This is the figure that decides the size of the battery. A bill says how much you use each month; hourly data says when, which is what matters here. You download it from your grid operator's customer area and we explain how.
Photos of the inverter and its rating plate
They tell us in a minute whether your unit accepts a DC-coupled battery, whether it has to be AC coupled, or whether replacing it is the better move.
Photos of where the battery would go and of the consumer unit
Location and switchboard condition change the installation work, and with it the quote.
Whether you want power during an outage, and on which circuits
Backup is sized and wired beforehand, and it shapes which battery makes sense to buy.
If you already have panels, the installation paperwork
The battery goes onto what is already there. If that paperwork does not turn up, we start by checking the state of the official file.

How much a home battery costs

The battery and its installation carry no catalogue price, for the same reason a full installation does not: the scope cannot be defined without seeing your consumption, your inverter and where the unit goes. What does carry a published price, VAT included, is the documentary work, and here it is with the figure in front of you.

Battery cost items and which of them carry a published price
ItemAmount
Battery, installation and commissioningQuoted after the study, with make, model and usable capacity. No catalogue price.
Documentary check on your panels, if you already have them€49, VAT included
Credit from that check€49 credited back if you book a €199-or-more service within 30 days
Legalising a battery added to an existing installationA separate service, with its price published on its own page.
Third-party fees on that checkNo third-party fees

The market reference, with its source

According to the annual self-consumption and storage report by APPA Renovables, the average residential price in Spain in 2025 was around 1,215 €/kW installed. That average covers the photovoltaic installation and does not include the battery, which is the line item that moves a quote the most and can approach the cost of everything else. According to UNEF, 61% of homes that installed panels in 2025 fitted a battery from the start.

How long it takes

There are three different clocks and they should not be added up. The installation one sits in your quote, with a date, because it depends on the unit chosen and on the manufacturer's supply. The one belonging to the authorities we never commit to. And ours, the documentary work that comes first, is the only one we do commit to, with its figure and with what it does not promise.

Timings for the upfront paperwork check

Our turnaround

2 working days

Counted from: Que el formulario esté completo y los documentos subidos.

What this turnaround does not cover

  • Un estado que no se pueda verificar con la documentación disponible.
  • Una fecha de respuesta de la distribuidora o de la comercializadora.
  • Que la instalación quede legalizada: esto clasifica el estado, no lo regulariza.

What depends on third parties

  • Your grid operator

    Confirmación del CAU o de la modalidad de autoconsumo registrada.

    No date commitment on our side.

  • Your electricity retailer

    Aclaración de por qué la factura no refleja compensación de excedentes.

    No date commitment on our side.

We commit to filing a complete application and following it through. The decision date is set by the authority, not by us, so we do not promise it.

Special cases that leave the short path

You already have panels fitted by another company

A battery can be added, and it is the most common case. Before touching anything it pays to know what your file says, because the modification is made on what is already on record. If it does not turn up, we find out what is there first.

Your inverter does not take a battery

Two ways out: AC couple the battery onto your current inverter, or replace it with a hybrid one. The second is more expensive and is quoted separately, with the figure in front of you before you decide.

You want power during a blackout

Only a battery with a backup function gives you that, installed with the function enabled and with the circuits chosen in advance. Without it, a grid outage shuts the panels down too, because of the inverter's anti-islanding protection.

Your house consumes mostly during the day

Then a battery may not pay off yet, and you will see that in writing in the study. Storing energy makes sense when you use at night what you produce during the day.

The installation was never legalised

Adding storage to a file that does not exist is not a modification, it is a regularisation. It gets sorted first and quoted for what it is.

Frequently asked questions about home batteries

Does a battery have to be legalised?

The file of a self-consumption installation describes one specific installation. If you add storage, the installation changes and the file has to change with it. Which modification applies depends on the architecture of the unit, and that is the first thing we classify. When the battery is part of an installation we carry out, the paperwork is inside the same job; when it is added to an existing installation, it is a service with its own page and price.

Will the battery keep my lights on during a power cut?

Only if it is a battery with a backup function and the installation has been prepared for it. Every grid-connected installation has anti-islanding protection: if the grid drops, the inverter disconnects for the safety of whoever is repairing the line. Without backup everything shuts down, battery included.

Can you fit a battery to panels installed by someone else?

Yes. We start by looking at what paperwork the installation has and which inverter it uses, because that is what decides whether the battery is DC or AC coupled. That check has a fixed price and is credited back if you then book the service that resolves whatever comes up.

Do I have to change the inverter to add a battery?

Not always. If your inverter is a hybrid or accepts a battery module, the battery is DC coupled. If it does not, the battery can be AC coupled with its own charging inverter. Replacing the inverter is the third option and we propose it when the numbers justify it, not as a default.

How long does a battery last and what warranty does it carry?

A home battery warranty is expressed as two conditions at once: years and cycles or total energy processed, and it ends with whichever comes first. The quote shows make, model, usable capacity and both conditions in writing, not the generic phrase leading brands.

Is it the same as the virtual battery my supplier offers?

No. A virtual battery is not equipment: it is an accounting credit with your supplier, on terms that supplier sets. It stores no kWh and gives no power during an outage. The full comparison of the three options is on our battery or surplus page.

The requirement that the file of a self-consumption installation describe the real installation comes from Royal Decree 244/2019, on electricity self-consumption, verified on .

Worth reading before you decide

Your battery size comes from your curve, not from a catalogue

Send us the bill and the hourly consumption and we will tell you how many kWh you would really use, which unit fits your inverter and what paperwork it brings with it. If the numbers do not favour you, you will see that in writing too.

A Captia Technology company. Chartered, qualified engineers.

Compare with the rest of the catalogue

Every service and every certificate, with its price including VAT, its pricing mode and third party fees listed separately, grouped by what is happening to the house rather than by what we call them.

See the price of every service and certificate

If the panels are already up

€49VAT included

Request the upfront check